A The installation process for 0A600 steel raised access flooring involves several steps, including:
● Preparation of the subfloor
● Installation of the pedestal system
● Placement of the steel panels
● Cutting of the panels to fit around obstacles
● Installation of any required accessories, such as ramps and handrails
● Final inspection and testing to ensure compliance with applicable standards and regulations.